Thu 1 May 2008
Klinaklini River at Risk Website - Proposed Hydroelectric Project by Kleana Power
Posted by PetraD under KlinakliniThe Klinaklini River, approximately 200 Km long, passes between some of the tallest and most remote peaks in the Coastal Mountain Range. With a mean annual discharge of close to 200 cubic meters per second (cms) and peak flows reaching as high as 18,000 cms the Klinaklini River is one of the largest rivers in the province. Home to large populations of threatened Grizzly Bear and Marbled Murrelet, this drainage currently encompasses some of least fragmented habitat on the Canadian West Coast. With recorded Salmon, Steelhead and Eulachon runs in the lower river found to be some of the largest in the Georgia Basin.
Kleana Power Corp, a junior energy corporation without any currently successful projects, has recently proposed to develop the largest private Run-of-River generating facility in BC’s history with an average generating capacity of 280 MW and a peak capacity of 700 MW. Pristine Power Inc. quotes annual generated power to be 2400 GWh. This equals approximately to 50% of the power expected from Site C. In order to create a generating capacity this large, generating and transmission infrastructure of large proportion will be necessary.
For more information visit: www.klinaklini.info